Pugmill Plant for Perry Aggregates Ltd – Tauhei, NZ

by | Jun 14, 2011 | Projects

Rocktec partnered with Perry Aggregates Ltd to deliver a purpose-built continuous mixing plant at their Tauhei quarry site in New Zealand. This high-performance solution was engineered for both efficiency and mobility. As a result, it was designed to handle demanding aggregate processing requirements with ease.

Project Overview: Custom Materials Handling Solution for Perry Aggregates

  • Client: Perry Aggregates Ltd
  • Location: Tauhei, New Zealand
  • Industry: Quarrying & Aggregates
  • Scope: Design and manufacture of a high-capacity mixing system
  • Completion: 2011

The Challenge: Improving Mixing Output and Site Mobility

Perry Aggregates Ltd needed a heavy-duty solution to improve the speed, consistency, and mobility of their quarry operations. Specifically, their goal was to implement a system capable of processing 250 tonnes of material per hour. Furthermore, it needed to be easy to relocate across their Tauhei site.

Rocktec’s Solution: Skid-Mounted Continuous Mixing Plant

continuous mixing plant – Perry Aggregates project

To solve this, Rocktec engineered and delivered a tailored continuous mixing plant that met all performance and mobility requirements. The system included:

  • A 20m³ feed hopper with a 900mm belt feeder
  • A rugged pugmill lined with rubber and UHMWPE for wear protection
  • All components skid-mounted for efficient transport and setup

Importantly, the mixing plant was designed to minimise downtime, handle tough aggregate conditions, and maintain a high output rate throughout continuous operation.

Continuous Mixing Plant Implementation Process: From Concept to Commissioning

  1. Design: Engineering teams scoped the plant to Perry’s operating targets and site layout.
  2. Build: High-performance materials were used to ensure durability in abrasive conditions.
  3. Assembly: A compact skid-mounted design enabled faster deployment with minimal disruption.
  4. Testing: Final commissioning confirmed output capacity and optimal material flow.

Results and Benefits

  • High Throughput: The system reliably delivered 250 tph processing rates, increasing overall productivity.
  • Operational Flexibility: Skid-frame construction allowed rapid relocation as needed, saving time during site adjustments.
  • Reduced Maintenance: Durable components helped cut downtime and extend equipment lifespan.

Conclusion: Built to Perform in the Field

continuous mixing plant – Perry Aggregates project

The successful delivery of this continuous mixing plant is a clear example of Rocktec’s engineering expertise in the quarrying and aggregates sector. It combined power, reliability, and practical mobility. Therefore, it sets a strong benchmark for future materials handling projects in similarly demanding environments.

Want to Learn More?

For more information on aggregate processing best practices, visit the Quarry Magazine website for industry insights and trends.

If you’re looking for a customised mixing or materials handling system, contact our team today to discuss your project.

Got Questions?

Get in touch with the Rocktec team for expert advice on engineering solutions & materials processing. Whether you need support, custom solutions, or have a general enquiry, we’re here to help — contact us today.

+64 7 881 9188

48 Mangawhero Road, Matamata 3400, New Zealand

Private Bag 4072, Matamata, 3440, New Zealand