Matahina Dam Reconstruction
Customer |
Thiess |
Project |
Matahina Dam Reconstruction |
Description |
Matahina Dam Reconstruction project was designed and Built at the same time as the Flat Top Quarry project. The plant was designed to produce a very tightly specified product that was screened and blended back through an automated tunnel blending plant. Handling a total of 750TPH the plant featured two 600HP Barmacs producing -10mm Chip and Sand |
Completion |
1998 |
Construction |
11 Weeks |